
Founder of Buzz & Banter, a brand and web designer with 10+ years in marketing, scaling 8-figure businesses, and helping entrepreneurs build brands that actually convert.
WANT to WORK TOGETHER?
Designing a brand and website takes as long as the decisions take. Plenty of projects drag on for months, mostly because of waiting on feedback, waiting on content and waiting on someone to make a call. With me, the design work itself takes two weeks: one week for the brand and one week for the website, with prep before and a launch after.
Two weeks sounds fast. It is fast. (That’s the point.) It’s also not rushed, and the difference is what happens before the clock starts. Here’s how the timeline really works, what decides it and what each phase looks like when you work with me.
The design work can happen in two weeks when strategy, content and feedback are planned before it starts. When they aren’t, the same project can stretch for months without getting any better.
Long timelines rarely mean more thinking. They usually mean more waiting. A logo sits in your inbox for ten days. The About page copy is “almost done” for a month. Nobody booked the photographer. Every pause costs momentum, and momentum is what gets a brand finished instead of abandoned at 80%.
Four things, and only one of them is the designer’s speed.
This is the big one. A two-week project needs a client who can look at a direction, react to it and give clear feedback quickly. If every decision needs a committee, a week of thinking and a poll of your group chat, no designer on earth can make it go fast.
Words and photos are the two things that stall a website the most. If the copy gets written after the design, you end up squeezing your message into boxes that were never built for it. If the photos don’t exist yet, the site sits half-built waiting for them. I don’t source images for clients, so brand photos or stock imagery need to be gathered before we kick off.
Skipping strategy feels faster on day one. It’s slower by month three, when nothing feels right and nobody can say why. I wrote about why the order of a rebrand matters if you’ve lived through that version.
I design on Showit because it gives me full design freedom and gives you a site you can edit without calling a developer. If you’re weighing platforms, here’s my take on Squarespace vs Showit vs Shopify.
Five phases. The two weeks in the middle get all the attention, but the phases around them are what make two weeks possible.
You get a dedicated client portal with everything you need to get ready for our project. I’m very Type A (it’s a gift), so it’s full of tutorial videos, walkthroughs, detailed instructions and clear due dates. Think of it as the homework that sets us up for a smooth project. You’re never guessing what’s next.
This is where the magic happens. On our kickoff call we go way past colors and vibes and get into what grows your business: who you’re trying to reach, where they’re finding you, what your competitors keep missing and where you want this business to be in two years. I’ll ask the questions most designers never think to ask and push on anything that feels fuzzy.
We build the entire foundation of your new brand. Strategy and visuals come together into a brand world your audience will be obsessed with. Everything gets designed to work together, because a logo here and a website there isn’t a brand. It’s a pile of assets.
Once the brand is approved, we move into the website. I design the whole site with your business goals in mind, so every section, every headline and every button is there for a reason. Pretty is great. Profitable is better.
Your site goes live, and you leave with everything you need to run it long after we hit publish: your final files, a custom tutorial video, your brand hub and 30 days of post-launch technical support if something breaks.
One of my clients, Emily, put the experience better than I can:
“I loved all the personalized loom videos to walk me through each deliverable at every stage. I also felt like the cadence of calls was perfect. It’s clear you have this business down to a SCIENCE.”
No. Two weeks is too fast to do it wrong, which is a very different thing. A short timeline forces the important decisions to happen early and on purpose instead of dribbling out over a season.
It also means you live in “almost done” for days instead of months. Another client, Maggie, said the structure is what made it feel manageable: “knowing what to expect and when made the whole experience feel clear, supported, and easy to move through.”
That’s the trade. You give the project your focus for two weeks, and you get your brand back working for you a whole lot sooner.
Show up with your content handled and your calendar protected. The faster you can say yes, no or “change this,” the faster you launch.
If you already know you’re capable of more and your current setup can’t keep up, let’s close that gap. I’ve helped 150+ businesses since 2023, including one that doubled her lead inquiries the week after launch, and I tend to book out a couple of months ahead.
Tell me about your business here and let’s find your kickoff date.
Wondering how timeline and scope affect the investment? Here’s why brand and website prices vary so much.
The design itself can take one week when your brand is already in place and your content is ready. Most of the time in a redesign goes to waiting on copy, photos and feedback, so prep is what shortens it.
With me, the brand is built in one week, after the prep and kickoff call. That includes the strategy and the visuals, designed together.
Slow feedback, unfinished copy and missing photos. Design speed is rarely the problem. Decisions are.
I tend to book out two to three months ahead, so reach out before you need it done, not the week you need it done.